Difference between revisions of "EE 652 projects"
From Contiki
(→Pedro) |
|||
Line 1: | Line 1: | ||
EE 652 2014 Projects | EE 652 2014 Projects | ||
− | + | == Pedro == | |
Repository: http://neptune.usc.edu:8081/pdasilva/tsch-schedulers/ | Repository: http://neptune.usc.edu:8081/pdasilva/tsch-schedulers/ | ||
Revision as of 10:46, 16 December 2014
EE 652 2014 Projects
Pedro
Repository: http://neptune.usc.edu:8081/pdasilva/tsch-schedulers/
Description:
How to compile: gcc -std=gnu99 -o Scheduling util/*.c graphs/*.c mcc/*.c tasa/*.c main.c
How to execute: ./Scheduling <sink_id> <algorithm> where: sink_id = Sink identification (starting at 0) algorithm = 0 if MCC and 1 if TASA
Output: you will find files ext_schedule.h and topology.c, which should be used according to the project report
The execution will consider data/prr55.txt file as input for PRR statistics. You need to create the file with tree description before running TASA. You can easily do that first running MCC for a given sink id (e.g. 3) and then running TASA for the same sink id.